Engineering geology: Difference between revisions
No edit summary |
No edit summary |
||
| Line 10: | Line 10: | ||
*for offshore [[outfall]], [[drilling platform]] and [[sub-sea pipeline]], sub-sea cable; and | *for offshore [[outfall]], [[drilling platform]] and [[sub-sea pipeline]], sub-sea cable; and | ||
*for other types of facilities. | *for other types of facilities. | ||
It is important to keep in mind that in [[engineering geology]], there are only two important types of [[rock]]: those which can be move by a [[bulldozer]], and those which require [[dynamite]]. | |||